Main Performance

Misung C&S Inspection

Technical Service Performance

(Please Click on the title to see all the performance results for the year.)

[2011] Gaejwa tunnel (Bridge & Tunnel), Pukyong national university (C…

페이지 정보

본문

Bridge and Tunnel field (Precision safety diagnosis, Precision inspection)

 

- Precision inspection of retaining wall on the access road for 3 complexes in Mandeok (Buk-gu Office, Busan Metropolitan City)

- Precision inspection of Gaejwa Tunnel (Construction Safety Test Office)

- Precision safety diagnosis of civil engineering structures besides Guseo-Beomeosa station (Busan Transportation Corporation)

- Precision inspection of 2 places besides Budu Bridge (Construction Safety Test Office)

 

 

Construction field (Precision safety diagnosis, Precision inspection, Defect diagnosis)

 

- Regular inspection of retaining wall of SK-VIEW apt., Daeyeon-dong, Busan (Apartment control office)

- Precision inspection of Bongwoo APT, Pyeongsan-dong (Apartment control office)

- Regular inspection of Cheonan-Asan station (Daejeon-Chungnam Branch Facilities Team)

- Precision inspection of Samsung APT, Daeyeon-dong, Busan (102, Samsung APT)

- Precision inspection of Hyeopsung Renaissance Town apt., Suyeong-dong, Busan (Apartment control office)

- Regular inspection of retaining wall of LG Jinro apt.

- Regular inspection of Emeraldhome APT, Jeonpo-dong, Busan (Apartment control office)

- Precision inspection of Yurim second APT, Gamcheon-dong, Busan

- Regular inspection of Haeundae Grand Hotel

- Precision inspection of Yurim APT, Gaya-dong, Busan

- Regular inspection of BTL dormitory in Bukyong National University (Dormitory control office)

- Precision inspection of Dongil Suite APT, Daeyeon-dong, Busan (Management office)

 

 

Harbor field (Precision safety diagnosis, Precision inspection)


- Precision safety diagnosis and Precision inspection of harbor facilities (Busan Port Authority)

- Working design of another place besides improvement construction of Oryukdo lighthouse dock (Busan Regional Maritime Affairs & Port Office)

- Precision safety diagnosis of pier 11-00 (Jinhae admiralty port)

- Basic and detailed design on the port renewal of Donghae port north pier (Donghae Regional Maritime Affairs & Port Office)

- Seismic performance evaluation of harbor facilities (Busan Port Authority)

- Precision inspection of 7 facilities including Jingisa pier (Defense Installations Agency)

- Seismic performance evaluation of harbor facilities in the West sea (Ministry of Land, Transport and Maritime Affairs)



Measurement management Field

 

- Measurement of subway structures(Minam-Dongrae section) adjacent to electric power pipes (Korean electric power corporation/Southern Construction Corps)

- Construction work of Busan subway line 1 extension section 1 and impedance test of one section (Hyundai Engineering & Construction)

- Integrity check for Joongma Woorim FilU in the housing site development area, Ma-dong, Gwangyang-si, Jeollanam-do (Woolim Engineering & Construction)

 

 

Engineering field (Integrity test, Dynamic loading test) 


- Simbat test of Angol Bridge (Daelim Industrial Co.,Ltd)

- Construction work of Busan subway line 1 extension section 1 and simbat test of one section (Hyundai Engineering & Construction)

- Rebuilding works of Pohang New Port pier 1(Berth 14) (POSCO E&C)

- Construction work and static and dynamic loading test of Busan subway line 1 extension section 1 (Hyundai Engineering & Construction)

- Construction work of National Wetlands Center (Areum Construction Co.,Ltd)

- Installation of wastewater treatment plant besides sewage treatment plant of Dalseocheon (Taeyoung E&C)

- Nakdong River restoration project section 43(Gamjeoncheon) (Sunggwang Engineering & Construction)

- Construction of Jeonggwan Dongil Suite 2nd apt. (Dongil Construction)

 


Construction work field


- Repair works of Hadan Bridge (Busan Construction Test Office)

- Repair and reinforcement work of pier 10-00 (Naval Logistics Command)

- Affiliated hospital ward construction of Yeongdo hospital(structure repair work) (Dongbo Construction Co.,Ltd)

- Environmental renewal projects on Bujeon ginseng market (Renovation work of Entrance) (Busanjin-gu Office)

- Structural reinforcement work of Nike store in Seomyeon

- Renovation work of Gamcheon elementary school cafeteria (Busan Bukbu Office of Education)

- Repair work of civil engineering and construction facilities (Busan Natural Gas Power Station)

- Repair work of Borams-house in Busan students educational institute (Busan Metropolitan City Office of Education)

- Renovation work of night-duty room (National Fisheries Research and Development Institute) 

댓글목록

등록된 댓글이 없습니다.

Misung C&S Inspection Co., Ltd.
Address
1351, Nakdongnam-ro, Saha-gu, Busan 604-853, Korea


Tel
82-51-291-2055
Fax
82-51-293-5379
E-mail
misung@mcsco.co.kr
상단으로