[2004] Yeongrak bridge (Bridge & Tunnel), Busan new port (Geophysical …
페이지 정보
본문
Bridge and Tunnel field (Precision safety diagnosis, Precision inspection)
- Precision safety diagnosis of Bokgae construction at Kyeonu main stream (Busan city Busan jin-gu district office)
- Precision inspection of Yeongrak bridge (Busan city Construction Safety Test Office)
- Precision safety diagnosis of Bokgae construction at Yongho stream (Busan city Construction Safety Test Office)
- Precision safety diagnosis of Bokgae construction at Daeyeon stream 1 (Busan city Construction Safety Test Office)
- Inner wall safety inspection according to the CRANES wheel load variance of HBCT (Hutchison Korea Terminals) )
- Precision safety diagnosis of Bokgae construction at Dongcheon (Busan city Construction Safety Test Office)
- Precision inspection of Daeti and Busan New Tunnel (Busan city Construction Safety Test Office)
- Foundation inspection of Jaseong viaduct (Busan Ministry Maritime Affairs and Fishes Busan Port Construction Office / Kolon Construction Co., Ltd)
- Precision safety diagnosis of Bokgae construction at Nam steam (Busan city Construction Safety Test Office)
- Precision safety diagnosis of Bokgae construction at Unsucheon (Busan city Construction Safety Test Office)
Physical exploration (seismic) field
- Seismic fault inspection during recovery work of typhoon (Mae Mi) at Embarkment (section 1) of dredge soil at Busan New Port
(Busan Port Construction Office / Korea Port Association) (2002, 2003, 2004)
- Ocean seismic inspection and geological inspection during construction work of break water at Doripo the second sort fish port
(Muangun office / Dongiim Construction Co.,Ltd)
- Dead stone settlement inspection during embankment building work at dredge soil at Go Hyun Port
(Masan Ministry Maritime Affairs and Fishes / Daekyung Construction Co.,Ltd)
- Seismic inspection during recovery work of typhoon damage at Busan New Port section 1 field
(Busan Port Construction Office / Daelim Construction Co.,Ltd)
Construction Field (Precision safety diagnosis, Precision inspection, Defect diagnosis)
- Construction defect diagnosis of Namheong APT at Bansong construction field (Precision safety diagnosis, Precision inspection, Defect diagnosis)
- Precision inspection of building and retaining wall of Hanshin the second apt. at Eomgung
- Structure Precision inspection and Precision & regular inspection of retaining wall of Byucksan Hights Town
- Construction safety inspection and measuring service at Bokji-dong of Korea Aerospace Industries Ltd.
- Precision safety inspection of Hanseong and Imho apt. (retaining construction inside apt.) at Sinpyeong
- Precision safety inspection of LG APT (retaining construction inside apt.) at New Gaegeum
- Preliminary safety inspection of construction (Rainbow Garden Villa)
- Precision inspection of union houses at Gibigol village
- Precision inspection of union houses 1 dong of Daeganjeongmil Chemical Co., Ltd
- Precision inspection of boundary retaining wall inside Chunggu apt. at Jurye
- Precision inspection of retaining wall's construction of a first-aid station at Maria
- Precision safety inspection of building of Busan factory at Dongju Industry Co.,Ltd
- Precision inspection of Daewoo second apt. at Daeyeon-dong
- Precision inspection of Jugong third houses apt. at Haeundae
- Precision safety inspection of municipal apt. two houses (12, 13house) at Deokcheon-dong
- Precision inspection of Hanshin second apt.'s parking lot at Eomgung
- Defect diagnosis of Oubang New World Town's construction
- Construction safety diagnosis of fire station at Gaya (Busan Jin fire station)
Harbor field (Precision safety diagnosis, Precision inspection)
- Construction safety diagnosis of Onsan Port's tourist ship pier / regular pier (Sejin Heavy Industry Co.,Ltd)
Building work field
- Toilet reform work of Deokpo middle school (Busan Bukbu Education Office)
- Repair work of power hole (4stage) going side by side subway section 1 (Korea Electric Power Corporation Busan Power Management)
- Damage recovery work of mooring facilities of Gamman Pier C/C at Busan New Port
(Korea Container Terminal Authority / Daewoo Construction)
- Work of staff toilet and the others at Nakdong high school (Busan Metropolitan Office of Education)
- Toilet reform and the others work of Galim and Yangseong elementary school (Busan Metropolitan Dobu Office of Education)
Engineering field (Integrity test, Dynamic loading test)
- Sonic test and PIT test of Yangsan Line's section 1 and Busan subway 1 line work
(Busan Transit Authority / Daewang E&C Co.,Ltd)
- Integrity test of cast in place pile during construction work at Machang Bridge
- SIMBAT TEST of four lane extending & pavement and bridge temporary installation work between Saengnim toSamnangjin (Samnangjin bridge)
(Gyeongsangnamdo office) (1999, 2000, 2001, 2002, 2003, 2004)
- Integrity test of Namji bridge's temporary installation work field for recovering flood damage at Namjije
- Non destructive test of PAP panel at reinforcement work field of 623 incline at Gam cheon Port
- Integrity test of PHC pile by seismic (Goryeo Development Co.,Ltd)
- SONIC TEST during cast in place pile work of 1 section construction work field at Namhang Bridge
- SONIC TEST and dynamic loading test during construction of Yangsan ICD rail
Measuring management field
- Construction safety inspection and measuring service at Korea Aerospace Industries Ltd. of Bukji-dong
April, May, October in 2004
- Participation for Overseas Exhibition (Display items: including ITS-2004)
November in 2004
- Additional registration in Engineering Activity Subject
(Construction field <engineering works, engineering qualification test, geological features, ground, foundation>)
- 이전글[2005] Jomahn bridge (Bridge & Tunnel), Daeyeon Samsaung APT (Construction), Ulsan new port (Harbor), etc. 20.11.18
- 다음글[2003] Busan new port (Geophysical exploration), Daeyeon high bridge (Bridge & Tunnel), Korea Maritime University (Construction), etc. 20.11.18
댓글목록
등록된 댓글이 없습니다.