[2002] Busanjin-gu Office (Construction), Busan port (Pile test), Busa…
페이지 정보
본문
Safety inspection (Construction)
- Precision inspection of Wonwoo APT at Sinpyeong-dong (2002. 02)
- Precision inspection of Hakjang second Samsung APT in Busan (2002. 02)
- Precision inspection service of Hyundai APT at Haeundae (2002. 05)
- Precision inspection of surrounding three buildings at model new work field (2002. 05)
- Precision inspection of Shinyangwon in Gimhae (2002. 08)
- Precision inspection of government office at Gijanggun office (2000. 08)
- Precision inspection of Samsung APT at Daeyeon-dong (2002. 09)
- Precision inspection service of Doosan second APT at Haeundae (2002. 09)
- Construction safety inspection three buildings around new work field at Yeongdo
Safety inspection (Harbor)
- Precision safety inspection of wharf at Okgye harbor (2002. 08)
Precision safety diagnosis (Bridge and Tunnel)
- Precision safety diagnosis service at Jaseong viaduct (2002. 09)
Precision safety diagnosis (Construction)
- Precision safety diagnosis of retaining wall at Goejeong field (2002. 10)
- Safety inspection of retaining wall at Yangsan MSC (2002. 03)
- Safety diagnosis of floor and steel frame of PET-2LINE at Botlring Co., Ltd in Yangsan's Coca Cola
Construction safety inspection
- Construction safety inspection into Hill tower field at Munhyeon-dong (2002. 06)
- Safety inspection of Yunsung tower field at Bujeon-dong (2002. 03)
- Safety inspection of new building field at Sepa world's 1020 in Ulsan
Measuring management of construction of subway, tunnel, bridge and road's working field
- Long term measuring service of front inspectioning and excavation between Daejeo and Gupo at Busan subway line 3 (1999. 06 ~ 2003. 08)
Inspection and supervision of steel bridge work
- Steel work supervision of Ungcheon bridge at Busan New Port
- Steel work supervision of Sinsuro at Sokcho
Sonic coring test of cast in place concrete pile
- Sonic coring test of ring road at Busan Harbor's pier
- Sonic coring test of bridge construction work field and extension & pavement work of four lane between Saengnim and Samnangjin (Samnangjin bridge) (2002. 03)
- Sonic coring test of cast in place pile of Yangsan Line 1 section extending Busan subway line 2 (2002 ~ 2004)
Impedance test and damage inspection of ready made pile depth
- Impedance test and core compression strength of levy building work field at Jisa stream
Simbat test of pile bearing capacity test
- Simbat test of ring road at Busan Habor's pier
- Simbat test service of PHC pile of SK VIEW apt. at Hadan
- Simbat test of bridge construction work field and extension & pavement work of four lane between Saengnim and Samnangjin (Samnangjin Jin bridge) (2002. 03)
- Dynamic loading test of ICD railroad building work field at Yangsan (2002 ~ 2003)
Repair·Reinforcement & Maintenance of all kinds of construction
- Repair & reinforcement work and inside repair work of construction at Busan branch office (2002. 04)
- Improvement work of toilet at Ganam elementary school (2002. 08)
- Repair & reinforcement work of sheeting temporary construction during building work at Buam dong Tower Vert ville
Physical exploration
- Ocean Seismic survey seabed ground at Gamcheon Harbor, multipurpose pier of Busan Harbor (2002. 08)
- Geological survey for safety diagnosis of Jedeok Dong's villa at Jinhae city (GPR, Electrical Resistivity Survey) (2002. 09)
- Geological survey for inspecting dead stone dropping amount at Busan New Port (2002. 08)
- 이전글[2003] Busan new port (Geophysical exploration), Daeyeon high bridge (Bridge & Tunnel), Korea Maritime University (Construction), etc. 20.11.18
- 다음글[2001] Gamman bridge (Bridge & Tunnel), Kyungdong APT (Construction), Busan subway (Measuring menagement), etc. 20.11.18
댓글목록
등록된 댓글이 없습니다.