Customer Support

Misung C&S Inspection

Resources

Analysis method of loading test result

페이지 정보

profile_image
작성자 관리자
댓글 0건 조회 726회 작성일 20-11-24 11:34

본문

Analysis of test result is decided as below.

 

1) Yielding loading result

- Comparison analysis by DAVISSON analysis method, △S/△(logt) - P analysis method, △S/△(logt) - P △S/△(logt) - P analysis, P-S curve analysis as Construction Office Law

 

2) Limit load decision method

- England Foundation Industry standard (0.1D)

 

3) Load - Analysis method by settlement curve < Analysis method of limit load >

The method for yielding load and limit load at loading test is that the load P1 of point A of maximum curve of bending foundation curve is yielding load like fig. 1.

 

(a) of (fig.4-2) is the method by DIN 1504 of Germany CP 2004(Code of practice 2004) of England and sharp moving point of load - settlement curve is limit load.

(b) of (fig. 4-2) is the method by S (1951) and limit load is that gradient of load - settlement curve state changes into straight state.

 

439c9dd1a6379d51f6042040096c36bc_1606185196_84.gif 

439c9dd1a6379d51f6042040096c36bc_1606185204_24.gif 

(a)DIN No.1054

439c9dd1a6379d51f6042040096c36bc_1606185212_72.gif 

(b)Schenck method

(fig. 4-1)Yielding load and limit load

(fig. 4-2) Limit load distinction method by load - settlement curve

 

4) Analysis method by all settlement

 

A load of pile is related to settlement of pile end and if the load is decided to limit load with setting special settlement of pile, there isn't error of analysis because of having a simpleness and clearness. Therefore this method is used widely but the value of pile settlement is different from country, organization and researcher so there is conflict.

 

All settlement value(Su) confronting limit load

Application of Country & Organization

[Su](mm)

Safety factor for allowable bearing capacity

Remarks

Germany / DIN 4014

20

 

- The construction no 

  sensitivity to differential 

  settlement

- The construction sensitivity

  to differential settlement

- Large diameter cast in place

  pile

- Small diameter cast in place

  pile

 

* D : pile diameter

 

France

20

 

Czechoslovakia

15-20

2

Austria

25

 

Netherlands

25.4

 

New York

25.4

 

India I.S 2911 standard

12

1.5

TERAZAGH/PECK(1967)

25.4

1.5

WOODWARD(1972)

12.7-26.4

1.5-2

TOUMA/REESE(1974)

25.4

 

Sobviet Russia Architectural Process Laboratory

30-40

 

Sobviet Russia Architectural Process Science Laboratory

80

 

China Road Laboratory (1976)

40

 

China Beijing Cith Pile Foundation Laboratory (1971)

15-20

2

Japan Old Architectual Academy Standard

25(yield load)

2

Japan Soil Engineering(1971)

25(yield load)

2

JOHNSON(1973)

< 0.1 D

 

England Foundation Engineering Standard (1975)

< 0.1 D

 

CAPPER/CASSIE

< 0.1 D

 

 

댓글목록

등록된 댓글이 없습니다.

Misung C&S Inspection Co., Ltd.
Address
1351, Nakdongnam-ro, Saha-gu, Busan 604-853, Korea


Tel
82-51-291-2055
Fax
82-51-293-5379
E-mail
misung@mcsco.co.kr
상단으로