Customer Support

Misung C&S Inspection

Resources

Steel structure welding technical review (Preheating working)

페이지 정보

profile_image
작성자 관리자
댓글 0건 조회 721회 작성일 20-11-24 10:46

본문

Preheating working

1) We should preheat not only bevel the inside but also both side of bevel 50∼100mm. Especially if is windy, a counterplot for protection against wind

In preheating, we judge that preheating temperature is proper with checking temperature chalk is melted. And it is better to do welding immediately. In case of temperature is low, scrupulous care is required because it is necessary to preheat base metal during welding.

2) Check point of preheating

① Existence write or not of preheating temperature and execution process in report for manufacture way.

② Check or not necessary preheating temperature according to quality of materials and thickness

③ Check or not a record of the air temperature.

④ Check or not the preheating range.

⑤ Record about preheating temperature of each parts.

댓글목록

등록된 댓글이 없습니다.

Misung C&S Inspection Co., Ltd.
Address
1351, Nakdongnam-ro, Saha-gu, Busan 604-853, Korea


Tel
82-51-291-2055
Fax
82-51-293-5379
E-mail
misung@mcsco.co.kr
상단으로